The product
Programme intelligence built for construction.
No Slip does one thing exceptionally well: it captures your weekly programme variance, locks it as an immutable snapshot, and builds a contemporaneous record that is defensible in adjudication.
Everything in the platform
Planning tool imports
- MS Project (MPP and XML)
- Asta Powerproject
- Primavera P6 (XER and XML)
- Column mapping saved on first import
Weekly snapshots
- Server-calculated variance against baseline
- RAG status per site
- Slippage cause category captured at snapshot time
- Recoverability flag per snapshot
Audit trail
- Append-only, tamper-evident log
- User attribution on every action
- IP and device fingerprint
- Exportable on request
Reporting
- Portfolio dashboard with RAG distribution
- Per-site variance trend chart
- Read-only client sharing links
- PDF export for board packs (coming soon)
Forensic analysis (optional)
- Delay chronology document
- Cause attribution summary
- Critical path impact statement
- Activated per claim for £2,500
Security
- ISO/IEC 27001:2022 certified
- UK GDPR compliant
- Multi-tenant row-level isolation
- EU-hosted infrastructure
Integrations
Works with your existing planning tool.
No Slip imports the export format your planners already produce. No new tools. No change to how you plan.
What our users say
“We used to spend Fridays building a deck that was out of date by Monday. Now the client sees what we see, when we see it. The conversations are different. We talk about delivery, not the report.”
“We had eight months of records nobody could argue with. The forensic module turned that record into a claim document for £2,500. Without No Slip we would have spent £85,000 to produce a weaker case retrospectively.”
“We are not the kind of company that buys software with twenty features we will never use. No Slip does one thing properly. Our weekly cycle takes minutes now. That is the entire pitch.”
Stop reconstructing your programme story. Start recording it.
Book a 20-minute demo. See No Slip running on a sample programme.